Working with Kier Construction (main contractors) and Quest Consulting (scheme engineers), Carnon Contracting have completed a piling contract at the Tulip Foods processing facility at Bodmin.
On site testing by Carnon Contracting enabled the design team to optimise the pile design, substantially reducing the number of piles required to meet the engineering specification.
The 200+ piles installed have provided the foundations for the construction of a new bacon processing plant facility for Tulip
Carnon was also able to achieve final sign-off to complete the works by using its own, in-house integrity testing capability.
The contract was completed on time and on budget.